Preparatory work:
1. Prepare raw materials such as raw rubber, oil and small materials according to the needs of the product;
2. Check whether the oil cups in the pneumatic triplet are filled with oil or without oil. Check the air compressor when the oil volume of the reducer is not less than 1/3 of the central oil level, and the air compressor will stop automatically after reaching the 8Mpa and release the moisture in the pneumatic triplet.
3. Pull up the handle of the material chamber door, open the chamber door, press the preparation button, turn on the power, the power indicator light of the small switchboard is on, and screw the upper top bolt knob to the “up” position. After the upper top bolt rises into position, Screw the mixing chamber knob to the “turning” position of the mixing chamber. The mixing chamber will flip outwards and stop automatically. During the mixing chamber, the sound and light alarm will be alarmed. Check the mixing room for no residual materials or debris. Rotate the mixing chamber knob to the “back” position, the mixing chamber will be turned back and automatically stopped, the mixing chamber knob will be placed in the middle position, and the required alarm temperature will be set according to the type of compound to be mixed. .